599 Somerville – Somerville, MA

45,000 SF, 3-story, LEED Platinum life science development with below grade parking.  The below grade construction utilizes secant pile construction as temporary support of excavation and permanent basement walls and water cutoff.  Above grade construction is composite steel construction designed to meet 2,000-8,000 micro-inches per second (mips) depending on tenant requirement.

Developer: Rafi Properties
Architect: Studio Troika
Contractor: Shawmut

View more H+O projects

We’re proud to support leading developers and architects nationally.

599 Somerville – Somerville, MA

45,000 SF, 3-story, LEED Platinum life science development with below grade parking.  The below grade construction utilizes secant pile construction as temporary support of excavation and permanent basement walls and water cutoff.  Above grade construction is composite steel construction designed to meet 2,000-8,000 micro-inches per second (mips) depending on tenant requirement.

Developer:
Rafi Properties
Architect:
Studio Troika
Contractor:
Shawmut
H

H+O Structural Engineering is the expert in structural design and optimization.  We help commercial real estate projects across the nation go smoothly and cost-effectively.

Do you know how much you could be saving on your building structure costs?

We help developers save an average of $800,000 in structure costs per project.

How is that possible? Structure costs are not something structural engineers typically measure, making it impossible for them – and you – to understand the cost implications of each design decision.

Seemingly insignificant design decisions greatly impact the bottom line.

Want to learn how we help our customers save hundreds of thousands?

Enter your email to get started.