BPDA Approval Sets 75 Morrissey on a Housing-First, Resilient Path

Location: 75 Morrissey Boulevard, Dorchester, MA
Partners: Copper Mill, POB Capital, CBT Architects, and H+O Structural Engineering
Milestone: BPDA approval → design phase now underway

Cbt 75 Morrissey I 93 Rendering
Rendering by CBT

A Milestone for Dorchester’s Future

Dorchester’s Morrissey Boulevard just reached an inflection point. With the Boston Planning & Development Agency’s approval of Phase I of the 35–75 Morrissey Boulevard master plan, the team—Copper Mill with POB Capital, CBT, and H+O Structural Engineering—has moved from entitlement into active design.

Phase I centers on two residential towers framing a new neighborhood park, prioritizing housing, public realm, and climate resilience near JFK/UMass.

Cbt 75 Morrissey Gateway Plaza Rendering
Rendering by CBT

From Master Plan to Momentum

The 2023 master plan envisioned a mixed-use district across seven buildings. In response to market need, the team pivoted decisively toward housing for Phase I, proposing:

  • 754 apartments (with 20% income-restricted units),
  • Ground-floor civic/retail space, and
  • A ~23,900 SF public park.

With BPDA approval secured, design coordination is now in full swing—aligning urban design, structural systems, building performance, and resident experience.

Design Underway: Resilience as a First Principle

Morrissey Boulevard’s waterfront adjacency demands climate-smart design. CBT and H+O are collaborating to elevate the site and integrate flood-resilient strategies while maintaining an active, welcoming streetscape.

H+O is advancing structural concepts that:

  • Support elevated grades and barrier strategies without compromising ground-floor transparency.
  • Optimize podium/garage spans for parking efficiency and future flexibility.
  • Coordinate early with MEP systems to keep floor-to-floor heights efficient.
Cbt 75 Morrissey Morrissey Blvd Rendering
Rendering by CBT
H+O Structural Engineering Logo
Don't wait for the next project.
Build your competitive edge today.

Housing + Mobility + Open Space

Phase I weaves together housing supply, mobility infrastructure, and high-quality open space. Plans include:

  • Underground garage with 414 spaces (25% EV-ready),
  • 760 bike storage spaces, and
  • New roadways connecting into Morrissey Boulevard and improving access around JFK/UMass station.

Structural grid decisions are being calibrated to maximize unit planning and minimize material tonnage, a hallmark of H+O’s cost-informed design approach.

Community-First Programming

At ground level, 7,450 square feet of civic space for nonprofits and locally-oriented retail ensure the project is an extension of Dorchester, not an enclave.

Copper Mill’s local roots and CBT’s urban design sensibility shape these choices, while H+O’s Boston-based team provides structural solutions that preserve generous ground-level volumes and protect long-term flexibility.

Cbt 75 Morrissey Lawn Rendering
Rendering by CBT

What’s Next

With BPDA approval in place, the design team is moving forward with the detailed design and coordination phase. CBT, a nationally recognized architectural firm, brings expertise in resilient urban design to this master plan.

As the structural engineering partner, H+O is focused on structural solutions balancing design vision with cost efficiency, constructability, and long-term value for ownership.

If you’re a CRE developer or architect working on large-scale, mixed-use multifamily developments, let’s talk about how H+O’s cost-informed structural design can de-risk your project.

Stay tuned for more updates as we progress through system selection and design development. The next major milestone on the horizon: groundbreaking in 2026.

Share post:
H

H+O Structural Engineering is the expert in structural design and optimization.  We help commercial real estate projects across the nation go smoothly and cost-effectively.